PVC Foam Plate Extrusion Die Head/Mould

FOB Reference Price:Get Latest Price
$111.00 - $2,222.00 / Set | 1 Set/Sets (Min. Order)
Shipping:
Support Sea freight
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Zhejiang, China
Brand Name:
TJingCheng
Model Number:
TJC01
Shaping Mode:
Extrusion Mould
Product Material:
Metal
Product:
Vehicle Mould
extrusion die head:
PVC foamed plate extrusion die
Supply Ability
Supply Ability:
30 Set/Sets per Month
Packaging & Delivery
Packaging Details
wooden box
Port
NingBo

Product

Die for PVC  foamed plate.
Product thickness: 3-19mm
Width of product: 1220mm, upper die lip is adjustable and down lip can be changerd.

Voltage

220V, 50HZ (Could be ordered by your need)

Driving power

within 5KW

Mode of connection

closed cycled connection

Adopts die steel

5CrNiMo steel

Heater element

Stainless steel heating rod

Fastening piece (screw)

12.9. High strength

Precision of polishing

Polishing precision of the stream surface of the die lip 0.03-0.04(um)other parts is 0.04-0.05(um)

Galvanization

the stream surface of the die head are treated by chrome treatment. Thickness0.015-0.03mm; hardness: 60-65Rockwellc; the chrome treatment thickness of the ektexine is 0.01-0.02mm.

Packing

Company Introduction

 

Taizhou Huangyan Toutuo Jingcheng Plastic Mould Factory and Taizhou Huangyan Zhengwei Mould Co.,Ltd are two branches of the same parent company,Jingcheng Plastic mould Factory, is located in Huangyan which called famous "China Mould Town","Plastic product Capital",originally established in 2004,our factory possess a number of high-level technical personnel with many years experiences in mould manufacturing
we have exported the mould to the USA,Russion,Turkey,VietNam,Europe,the middle east and other countries and areas.We have also established long-standing and stable friendship and cooperation with them. 

1.R&D
We support customer R&D. Make the files or improve the design if you needed.
2.Negotiation
the quality, price, material, delivery time, payment item, ect.
3.Place an order
according your own design or you chooses our design
4. Mould
According customers request to build the mould. Before make the mould, we send mould design to customer approval first, before move forward to production; we send samples to customer to confirm first.
5. Sample shoot
If the first sample come out is not satisfied customer, we modify the mould and until meet customers satisfactory.
6.Products in store
If your quantity is beyond our storage, we will provide lead time to you
7. Delivery
Delivery goods by sea or by air, according customers requirement